Skip to main content

RESOURCES

 

PPIP Cover Image

Project Implementation Prioritization Plan
The Program Priorities and Implementation Plan (PPIP) is meant to be the framework to guide the implementation of the Pure Water AV Program cost-effectively, using an expedited schedule, all while producing high-quality deliverables for the Program. Before project implementation, a multi-step approach was developed.

 

 

 

Palmdale Regional Water Augmentation Feasibility Study
2021 Palmdale Regional Water Augmentation Feasibility Study
This Technical Memorandum (TM) briefly presents the project background, scope of work, regulatory requirements, infrastructure requirements and initial costs to evaluate the feasibility of Palmdale Water District (PWD) utilizing recycled water for both surface water and/or groundwater augmentation.

Well No. 36 and Well No. 37 Siting Study
2020 PWD Well Site Assess FINAL Report
This study assesses the two proposed well sites as to suitability for installation of new groundwater production wells, and identifies the site that has the greatest probability of success.

PWD Well Rehabilitation Prioritization Plan
2021 PWD Well Rehabilitation Prioritization Plan  
The plan is to prepare a roadmap to maximize local water supply sources and reduce reliance on costly imported water. This planning document will guide PWD in decision making for future well maintenance and well replacement projects designed to optimize and maintain production capacity. It will identify those wells that are in most need of rehabilitation and that offer the best chance for success at the lowest cost. It will also identify wells that should be operated to failure while planning for replacement.

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION
Pure Water Notice of Intent Signed October 15, 2025
The Palmdale Water District (PWD) prepared an Initial Study for the Pure Water Antelope Valley Project (Pure Water AV). Based on the information contained in the Initial Study, PWD intends to adopt a Mitigated Negative Declaration for the project under the California Environmental Quality Act (CEQA). PWD is the CEQA Lead Agency for the Project.

Pure Water Antelope Valley CEQA Initial Study
Pure Water CEQA Initial Study
Pure Water AV is a regional water augmentation program using indirect potable reuse (IPR) by groundwater augmentation via direct injection. Using advanced treatment processes including microfiltration (MF), reverse osmosis (RO), and ultraviolet/advanced oxidation processes UV/AOP), Pure Water AV would further purify tertiary treated (Title 22) wastewater to produce water that would meet all applicable state and federal drinking water standards and regulations for IPR.